Library

Library

6blqf4orab|20105FDA6D7F|admin_dbiti|WebContentMaster|ContentDetails|0xfefff70700000000486a000001001800

The institute follows the infrastructure requirements as laid down in the NCVT Annexure G -5 which detailsthe information relating to the trade wisequalification, duration, unit size and trade wise requirement ofspace, power supply, equipment etc. The building and site plan of ITI and registration paper / leasedocuments etc. are uploaded in Accreditation application to NABET ? QCI forms.

Books Avalability

6blqf4orab|20105FDA6D7F|admin_dbiti|WebContentMaster|ContentDetails|0xfeff560800000000716a000001001600

The institute follows the infrastructure requirements as laid down in the NCVT Annexure G -5 which detailsthe information relating to the trade wisequalification, duration, unit size and trade wise requirement ofspace, power supply, equipment etc. The building and site plan of ITI and registration paper / leasedocuments etc. are uploaded in Accreditation application to NABET ? QCI forms.